K-Civic · ULB & Smart City MSWM

Decentralised composting + MRF for Nagar Nigams & Smart City wards.

Turnkey 5–50 TPD MSWM plants for Urban Local Bodies, Cantonment Boards and Smart City missions. SBM 2.0 / AMRUT 2.0 / 15th FC aligned. GeM-procurable equipment package + civil + commissioning + O&M under one PM team.

Typical scope of supply

  • Decentralised composting shed with 2–4 K-Drum / K-Thermo lines
  • Pre-treatment dual shaft shredder for MSW
  • Trommel screen (60–80 mm) + ballistic separator
  • Magnetic separator + air density separator
  • K-BPM 25 / 50 baling press for recyclables
  • RDF baler + storage area for cement-kiln offtake
  • Compost screening unit (vibrating / trommel)
  • Curing platform with windrow management
  • Leachate collection & treatment package
  • SLF rejects routing & transfer station
  • PLC-based central control panel + SCADA
  • Operator training (bilingual) + AMC option

Eligible funding schemes

  • SBM-Urban 2.0 — Centre 25–50%, State 20–30%, ULB 20–50% (city-tier dependent)
  • AMRUT 2.0 — Project-based, sanitation outcome framework
  • 15th FC tied grant — Direct ULB grant, fastest path
  • State scheme — Top-up where central is full
  • PPP / HAM — For projects above ₹25 Cr

Compliance docs included

  • SWM Rules 2016 alignment dossier
  • CPCB MSW Processing Guidelines
  • State PCB CTE/CTO documentation
  • SBM 2.0 / AMRUT 2.0 MIS alignment
The KWTPL edge

Why ULBs pick K-Civic

🏛 GeM-listed manufacturer

Product code 90131500. Direct procurement, no intermediary markup. MSE price preference under GFR Rule 153 (L1+15%).

🔧 In-house manufacturing

Single-vendor accountability. No imported equipment, no opaque supply chain. Service engineer on-site within 24–48 hr.

📋 DPR-ready BOQ

Free DPR review for ULBs. We provide L1-justifiable specs, rate dossiers, and MIS-aligned reporting templates.

Sample worked example

50 TPD ULB plant for a tier-2 city

Project: 50 TPD MSWM, district HQ town in Haryana, 4 lakh population

Total CapEx₹14 Cr
Equipment₹7 Cr (50%)
Civil works₹4.5 Cr (32%)
Electrical / automation₹1.4 Cr (10%)
PM & commissioning₹1.1 Cr (8%)
Timeline16 – 20 weeks

Funding mix

SBM-U 2.0₹10 Cr (Centre ₹5 Cr + State ₹2.5 Cr + ULB ₹2.5 Cr)
15th FC tied grant₹3 Cr (MRF equipment via GeM)
ULB own funds₹1 Cr (contingency, design)

Full DPR available on request under NDA.

Have a ULB MSWM project in DPR / tender stage?

Send the document to info@kelvinindia.in for free engineering review.

Configure via wizard →
FAQ

Common ULB tender questions

Which schemes can fund a K-Civic plant?

SBM 2.0 (50% Centre + 25% State + 25% ULB for 5–50 TPD plants), 15th Finance Commission tied grants, AMRUT 2.0 for cities >1 lakh population, Smart Cities Mission ABD/PAN-City projects. We supply scheme-specific BOQ templates and rate-justification dossiers — see our SBM funding decision tree.

What's the indicative CapEx for a 5 / 25 / 50 TPD plant?

Indicative ex-Manesar (2026): 5 TPD ~₹1.2 – 1.8 Cr · 10 TPD ~₹2 – 3 Cr · 25 TPD ~₹5 – 7 Cr · 50 TPD ~₹10 – 14 Cr. Excludes civil, weighbridge, fire safety, fencing, transformer. ULB own-fund share typically 25% under SBM 2.0; the rest is centre + state.

Which products go into a typical K-Civic line?

Pre-treatment: Dual-shaft shredder (≤3,000 kg/hr) + single-shaft shredder for finer screening. Composting: K-Drum (natural, lowest CapEx) or K-Thermo (heated, FCO-grade). Dry-waste: K-Recover MRF with K-BPM 25 / K-BPM 50 baling press.

What's the typical project timeline?

16-24 weeks DPR-to-commissioning for a 5–25 TPD plant. The longest pole is usually civil works + state PCB CTE/CTO. KWTPL provides design documentation; the ULB drives the consent process.

L1+15% rule under GFR 153 — does KWTPL qualify?

Yes. KWTPL is a GeM-Verified OEM + MSME Udyam-registered (Class-I local supplier under Make-in-India). Our quotes qualify for L1+15% purchase preference under GFR Rule 153 and the Public Procurement Policy. See our full credentials pack.

Post-commissioning support?

1-year comprehensive warranty on all equipment + AMC packages from year 2. Engineer on-site within 24-48 hr of any service call. Same-day spare parts ex-Manesar. Operator training (40 hours) included with commissioning.