Projects & Installations

From institutional canteens to municipal yards.

Selected installations across India and 18+ export countries. 100+ machines deployed; 60+ project photos from our Manesar plant and customer sites.

K-OWC-75 Organic Waste Compost Machine
K-Thermo75 kg/d

K-OWC-75 — Institutional canteen, North India

Wheeled compact OWC with PLC-controlled mixing & standby thermostat.

75 kg/day2024
K-OWC-100 Organic Waste Compost Machine
K-Thermo100 kg/d

K-OWC-100 — Corporate office park, NCR

Compact deployment with KWTPL-branded green livery, side output door, collection bin.

100 kg/day2024
K-Thermo K-OWC-100 organic waste compost machine
K-Thermo100 kg/d

K-Thermo K-OWC-100 — Hospitality cluster, South India

Heated 22-24 hr cycle composter for hospitality kitchen waste — wheeled, FCO-grade output.

100 kg/day2024
K-OWC-500 outdoor installation
K-Thermo500 kg/d

K-OWC-500 — FMCG facility, Maharashtra

500 kg/day Thermo Composter with PLC, SS 304 mixing chamber, weather canopy.

500 kg/day2023
K-Thermo large-format composter installation
K-ThermoLarge-format

K-Thermo large-format — Educational campus, North India

Large-format K-Thermo composter for residential mess kitchen waste. Branded green livery, full safety enclosure.

Large-format2023
K-Drum dispatch under crane
K-DrumDispatch

K-Drum dispatch — Export consignment

Crane-loading of fully-packaged K-Drum at Manesar plant, ready for outbound shipment.

Export consignment2024
K-Drum natural composter at municipal facility
K-Drum1500 kg/d

K-Drum 1500 — Municipal ward, Haryana

Drum-in-vessel natural composter for SBM 2.0 decentralised composting.

1500 kg/day2023
K-BPM 25 baling press
K-BPM 2525 ton

K-BPM 25 baling press — MRF site

Vertical hydraulic baler for PET, HDPE, paper and cardboard.

25 ton2023
KWTPL shredder unit
ShredderSS 304

Single shaft shredder — Garden waste line

Standalone shredder for horticulture pre-treatment line.

Up to 500 kg/hr2024
K-OWC-200 + adjacent K-OWC-100
K-OWC-200+ K-OWC-100

K-OWC-200 + 100 — Eco-park, Western India

Side-by-side OWC line with daily safety placards and SOP charts.

300 kg/day combined2024
K-Drum drum-style composter installation
K-DrumIn commissioning

K-Drum line — Industrial estate, Maharashtra

Drum-style natural composter during pre-commissioning trial run.

Confidential2024
K-Drum composter dispatch — export consignment
K-DrumExport consignment

K-Drum dispatch — OEM export, ME region

Large-format K-Drum natural composter manufactured for an OEM partner servicing Middle East.

Bulk export2023
Case studies

Five recent installations — problem, solution, result

Anonymised mini case studies from our 100+ deployments. Names redacted on request; full reference details available on tender enquiry.

K-Thermo · Hospitality

Educational campus, Haryana — K-OWC-200

Problem

180–210 kg/day mess kitchen waste sent to a landfill contract at ₹22,000/month. Compost was bought in for landscaping at ₹8,000/month. Total disposal + supply cost: ₹30,000/month.

Solution

K-Thermo K-OWC-200 (heated, 22-24 hr cycle) installed with PLC, screening unit, weather canopy. Operator training (40 hrs) + commissioning. Total CapEx ~₹15 L.

Result

Zero outsourced disposal. ~150 kg/day FCO-grade compost goes straight to in-house landscaping. Net saving ₹30,000/month + ~30 hr engineer-on-site service in 14 months.

K-Thermo · FMCG

FMCG plant, Maharashtra — K-OWC-500

Problem

500 kg/day mixed canteen + production-floor organic waste, EPR plastic-credit obligations under PWM 2016 (am. 2022) escalating year-on-year. Procurement compared 3 OEMs before tender.

Solution

K-Thermo 500 kg/d composter with full PLC + SS 304 mixing chamber + trolley feeder. Pre-bid factory inspection at Manesar; SS 304 build + L&T-spec electricals chosen over imported alternatives. CapEx ~₹22 L.

Result

Daily 500 kg organic stream handled in-house. Composted output supports landscape + plantation drives. EPR plastic-credit gap closed via paired K-BPM 25 baling press for dry-waste stream.

K-Drum · Municipal

Municipal ward, Haryana — K-Drum 1500

Problem

1,500 kg/day decentralised composting requirement under SBM 2.0 ULB ward project; tender required SS 304 contact parts + GeM-Verified OEM with L1+15% MSME preference under GFR Rule 153.

Solution

K-Drum drum-in-vessel (natural, 15-day cycle) with MSEP / FRP coating, 3-phase 415 V, PLC controls. Supplied via GeM under product code 90131500. Total CapEx (machine + civil) ~₹38 L; ULB share 25% under SBM 2.0.

Result

Decentralised compost shed processes ward-level wet waste, eliminates landfill route. Compost distributed free to citizens; net impact: zero ULB OPEX premium beyond AMC.

K-BPM 25 · MRF

MRF dry-waste site — K-BPM 25 baling press

Problem

Mid-size MRF processing 4 TPD dry-waste needed in-house baling for PET / paper / cardboard / HDPE; previously paying 3rd-party balers ₹1.5/kg + transport. Site running at <30% margin.

Solution

K-BPM 25 vertical hydraulic baler (25-ton press, 300–500 kg/m³ density, 3-phase 415 V). Single-operator load-cycle-strap-tip workflow. CapEx ~₹7.5 L; payback 11 months on baling-cost saving alone.

Result

3rd-party baling cost eliminated. Bale density & quality improved — offtake price up by ~₹4-6/kg on PET / cardboard. Site margin recovered to ~45% within 6 months.

Export · OEM

Middle East OEM — export consignment, K-Drum line

Problem

Middle East OEM partner needed a private-label rotary composter line with same SS 304 build + IEC-spec electricals as their European-branded equivalent; budget required 30%+ saving vs European OEM.

Solution

Bulk K-Drum export consignment manufactured at Manesar with private-label livery; CE-marking documentation + risk-assessment dossier supplied. Same build standard as domestic SBM units — no spec downgrade.

Result

OEM partner re-orders annually; we now supply across UAE, Australia, USA, Germany, Canada, Nepal, Bangladesh, Bhutan, Mexico, China & more — 18+ export countries cumulative.

By sector

Where 100+ KWTPL machines run today

Approximate breakdown of deployments by buyer sector. Marquee names available under tender NDA.

~28%of deployments

🏛 ULB & Smart City

Decentralised composting, MRF, MSWM lines for Nagar Nigams, Cantonment Boards, Smart City wards. Funded via SBM 2.0 / AMRUT 2.0 / 15th FC. Marquee: Indian Oil Corp ULB partnerships.

~24%of deployments

🏭 FMCG & manufacturing

In-plant organic waste composting, EPR plastic-credit pathway via paired baling press. Marquee: Amul, Jubilant FoodWorks, Johnson Matthey, DENSO, ITC Limited.

~18%of deployments

🏨 Hotel · hospital · institutional

K-OWC-100 / 200 / 500 for hospitality kitchens, hospital kitchen + biomedical via paired MWI. Marquee: LuLu Mall, branded hotel chains, multi-specialty hospitals.

~12%of deployments

🛒 MRF & recycling

K-BPM 25 / 50 baling press at municipal CBWTFs, brand-owner MRFs, EPR aggregators. Marquee: Flipkart reverse-logistics MRFs.

~10%of deployments

🏛 Government / PSU / embassy

OWC machines, MWI for PSU campuses, embassies, government health facilities. Marquee: American Embassy New Delhi, multiple PSU canteen / hospital sites.

~8%of deployments

🌍 Export · OEM partners

Private-label OEM consignments to Middle East, Australia, USA, Germany, Canada, Nepal, Bangladesh, Bhutan, Mexico, China & more. CE-marking + IEC-spec available.

Project lifecycle

How a typical KWTPL project flows

Single-vendor accountability from DPR to AMC. Below is a typical 6-stage lifecycle for a 5–25 TPD MSWM project.

1. Enquiry & brief

Configurator / RFP submission · pre-bid clarification in 48 hrs · scope alignment

2. DPR & site survey

Feedstock matrix · land study · electrical load · BOQ + indicative CapEx

3. Tender / PO

Technical bid · GeM L1+15% under GFR 153 · purchase order · advance & mobilisation

4. Manufacturing

Fabrication ex-Manesar · 6–14 wk · pre-dispatch inspection · QAP sign-off

5. Erection & commissioning

Civil interface · piping & electrical · trial run · operator training (40 hrs)

6. Handover & AMC

1-yr warranty · CTE/CTO support · AMC packages from year 2 · same-day spares

FAQ

Common project questions

Can KWTPL handle a turnkey MSWM project end-to-end?

Yes. KWTPL bids as turnkey EPC for MRF, MSWM and decentralised composting plants — covering DPR, civil works, multiple machines, integration, commissioning and AMC. See Solutions for K-Civic (ULB MSWM 5–50 TPD), K-Campus (institutional 100 kg/d – 5 TPD), K-Recover (MRF 5–100 TPD), K-Pyro (pyrolysis 2–20 TPD).

Are these references available for tender submission?

Yes — full reference details (client name, capacity, year, contact for verification) are available to bona-fide tender / DPR / RFP buyers under standard NDA. Send your tender enquiry via the contact form or email info@kelvinindia.in with subject [Reference Verification].

What's the typical project timeline from PO to commissioning?

5–10 TPD MSWM plant: 14–20 weeks from PO to commissioning. 25–50 TPD: 18–28 weeks. 100 TPD MRF: 22–32 weeks. K-Pyro pyrolysis: 28–36 weeks (CPCB CTE/CTO process is the longest pole). Single-product machines (composters, balers, shredders, MWI): 6–14 weeks ex-Manesar.

Do you support pre-bid factory inspections?

Absolutely. Pre-bid factory inspections are welcomed and recommended — we'll arrange a guided tour of our 30,000+ sq ft Manesar plant, walk you through the QAP, fabrication line, and meet the engineering team. Schedule via the contact form.

Can I see a working K-Drum / K-Thermo / MWI before signing?

Yes — we can arrange site visits to operating installations (subject to host-buyer permission). For K-Drum and K-Thermo we have multiple Delhi-NCR sites accessible within a day trip. For MWI / pyrolysis, longer-distance visits are coordinated case-by-case.

What documentation comes with every project?

QAP (Quality Assurance Plan), Pre-Dispatch Inspection report, electrical & mechanical drawings, O&M manual, operator training certificate (40 hrs), 1-year warranty card, AMC contract template, spare-parts list, fault-recovery checklist, CTE/CTO design dossier (where applicable). All in English; Hindi available on request.