
K-OWC-75 — Institutional canteen, North India
Wheeled compact OWC with PLC-controlled mixing & standby thermostat.
Selected installations across India and 18+ export countries. 100+ machines deployed; 60+ project photos from our Manesar plant and customer sites.

Wheeled compact OWC with PLC-controlled mixing & standby thermostat.

Compact deployment with KWTPL-branded green livery, side output door, collection bin.

Heated 22-24 hr cycle composter for hospitality kitchen waste — wheeled, FCO-grade output.

500 kg/day Thermo Composter with PLC, SS 304 mixing chamber, weather canopy.

Large-format K-Thermo composter for residential mess kitchen waste. Branded green livery, full safety enclosure.

Crane-loading of fully-packaged K-Drum at Manesar plant, ready for outbound shipment.

Drum-in-vessel natural composter for SBM 2.0 decentralised composting.

Vertical hydraulic baler for PET, HDPE, paper and cardboard.

Standalone shredder for horticulture pre-treatment line.

Side-by-side OWC line with daily safety placards and SOP charts.

Drum-style natural composter during pre-commissioning trial run.

Large-format K-Drum natural composter manufactured for an OEM partner servicing Middle East.
Anonymised mini case studies from our 100+ deployments. Names redacted on request; full reference details available on tender enquiry.
180–210 kg/day mess kitchen waste sent to a landfill contract at ₹22,000/month. Compost was bought in for landscaping at ₹8,000/month. Total disposal + supply cost: ₹30,000/month.
K-Thermo K-OWC-200 (heated, 22-24 hr cycle) installed with PLC, screening unit, weather canopy. Operator training (40 hrs) + commissioning. Total CapEx ~₹15 L.
Zero outsourced disposal. ~150 kg/day FCO-grade compost goes straight to in-house landscaping. Net saving ₹30,000/month + ~30 hr engineer-on-site service in 14 months.
500 kg/day mixed canteen + production-floor organic waste, EPR plastic-credit obligations under PWM 2016 (am. 2022) escalating year-on-year. Procurement compared 3 OEMs before tender.
K-Thermo 500 kg/d composter with full PLC + SS 304 mixing chamber + trolley feeder. Pre-bid factory inspection at Manesar; SS 304 build + L&T-spec electricals chosen over imported alternatives. CapEx ~₹22 L.
Daily 500 kg organic stream handled in-house. Composted output supports landscape + plantation drives. EPR plastic-credit gap closed via paired K-BPM 25 baling press for dry-waste stream.
1,500 kg/day decentralised composting requirement under SBM 2.0 ULB ward project; tender required SS 304 contact parts + GeM-Verified OEM with L1+15% MSME preference under GFR Rule 153.
K-Drum drum-in-vessel (natural, 15-day cycle) with MSEP / FRP coating, 3-phase 415 V, PLC controls. Supplied via GeM under product code 90131500. Total CapEx (machine + civil) ~₹38 L; ULB share 25% under SBM 2.0.
Decentralised compost shed processes ward-level wet waste, eliminates landfill route. Compost distributed free to citizens; net impact: zero ULB OPEX premium beyond AMC.
Mid-size MRF processing 4 TPD dry-waste needed in-house baling for PET / paper / cardboard / HDPE; previously paying 3rd-party balers ₹1.5/kg + transport. Site running at <30% margin.
K-BPM 25 vertical hydraulic baler (25-ton press, 300–500 kg/m³ density, 3-phase 415 V). Single-operator load-cycle-strap-tip workflow. CapEx ~₹7.5 L; payback 11 months on baling-cost saving alone.
3rd-party baling cost eliminated. Bale density & quality improved — offtake price up by ~₹4-6/kg on PET / cardboard. Site margin recovered to ~45% within 6 months.
Middle East OEM partner needed a private-label rotary composter line with same SS 304 build + IEC-spec electricals as their European-branded equivalent; budget required 30%+ saving vs European OEM.
Bulk K-Drum export consignment manufactured at Manesar with private-label livery; CE-marking documentation + risk-assessment dossier supplied. Same build standard as domestic SBM units — no spec downgrade.
OEM partner re-orders annually; we now supply across UAE, Australia, USA, Germany, Canada, Nepal, Bangladesh, Bhutan, Mexico, China & more — 18+ export countries cumulative.
Approximate breakdown of deployments by buyer sector. Marquee names available under tender NDA.
Decentralised composting, MRF, MSWM lines for Nagar Nigams, Cantonment Boards, Smart City wards. Funded via SBM 2.0 / AMRUT 2.0 / 15th FC. Marquee: Indian Oil Corp ULB partnerships.
In-plant organic waste composting, EPR plastic-credit pathway via paired baling press. Marquee: Amul, Jubilant FoodWorks, Johnson Matthey, DENSO, ITC Limited.
K-OWC-100 / 200 / 500 for hospitality kitchens, hospital kitchen + biomedical via paired MWI. Marquee: LuLu Mall, branded hotel chains, multi-specialty hospitals.
K-BPM 25 / 50 baling press at municipal CBWTFs, brand-owner MRFs, EPR aggregators. Marquee: Flipkart reverse-logistics MRFs.
OWC machines, MWI for PSU campuses, embassies, government health facilities. Marquee: American Embassy New Delhi, multiple PSU canteen / hospital sites.
Private-label OEM consignments to Middle East, Australia, USA, Germany, Canada, Nepal, Bangladesh, Bhutan, Mexico, China & more. CE-marking + IEC-spec available.
Single-vendor accountability from DPR to AMC. Below is a typical 6-stage lifecycle for a 5–25 TPD MSWM project.
Configurator / RFP submission · pre-bid clarification in 48 hrs · scope alignment
Feedstock matrix · land study · electrical load · BOQ + indicative CapEx
Technical bid · GeM L1+15% under GFR 153 · purchase order · advance & mobilisation
Fabrication ex-Manesar · 6–14 wk · pre-dispatch inspection · QAP sign-off
Civil interface · piping & electrical · trial run · operator training (40 hrs)
1-yr warranty · CTE/CTO support · AMC packages from year 2 · same-day spares
Click any image to expand. Use the filter buttons above to narrow by category.
Yes. KWTPL bids as turnkey EPC for MRF, MSWM and decentralised composting plants — covering DPR, civil works, multiple machines, integration, commissioning and AMC. See Solutions for K-Civic (ULB MSWM 5–50 TPD), K-Campus (institutional 100 kg/d – 5 TPD), K-Recover (MRF 5–100 TPD), K-Pyro (pyrolysis 2–20 TPD).
Yes — full reference details (client name, capacity, year, contact for verification) are available to bona-fide tender / DPR / RFP buyers under standard NDA. Send your tender enquiry via the contact form or email info@kelvinindia.in with subject [Reference Verification].
5–10 TPD MSWM plant: 14–20 weeks from PO to commissioning. 25–50 TPD: 18–28 weeks. 100 TPD MRF: 22–32 weeks. K-Pyro pyrolysis: 28–36 weeks (CPCB CTE/CTO process is the longest pole). Single-product machines (composters, balers, shredders, MWI): 6–14 weeks ex-Manesar.
Absolutely. Pre-bid factory inspections are welcomed and recommended — we'll arrange a guided tour of our 30,000+ sq ft Manesar plant, walk you through the QAP, fabrication line, and meet the engineering team. Schedule via the contact form.
Yes — we can arrange site visits to operating installations (subject to host-buyer permission). For K-Drum and K-Thermo we have multiple Delhi-NCR sites accessible within a day trip. For MWI / pyrolysis, longer-distance visits are coordinated case-by-case.
QAP (Quality Assurance Plan), Pre-Dispatch Inspection report, electrical & mechanical drawings, O&M manual, operator training certificate (40 hrs), 1-year warranty card, AMC contract template, spare-parts list, fault-recovery checklist, CTE/CTO design dossier (where applicable). All in English; Hindi available on request.
Send your scope-of-work and we'll respond with a tailored technical brief, indicative BOQ, scheme alignment notes and CapEx range within 1 working day. Pre-bid clarifications in under 48 hours.