Four sub-branded programs. From a 5 TPD ULB ward to a 100 TPD MRF.
We don't just supply machines. We do site survey, DPR, civil works, electrical, commissioning and O&M β under one accountable PM team. Specially structured for GeM, SBM 2.0 and AMRUT 2.0 procurement.
ULB MSWM
Decentralised composting + MRF for Nagar Nigams & Smart City wards.
- Decentralised compost shed + segregation
- Pre-treatment shredders, OWC line
- RDF baling, SLF rejects routing
- SWM Rules 2016 compliance docs
Institutional decentralised
On-site composting for hotels, hospitals, IT campuses, FMCG factories.
- K-Drum or K-Thermo + shredder + bin
- Civil pad + electrical + canopy
- Operator training + 1-yr warranty
- EPR-billable BOQ structure
Material Recovery Facility
Dry-waste sorting line: trommel, separators, optical sorter, K-BPM 25 / 50 baling presses.
- Manual + mechanical sorting line
- K-BPM baling press (PET/HDPE/paper)
- Recyclables aggregation hub
- EPR / PRO-aligned operations
Tyre & plastic pyrolysis
End-of-life tyres & plastic to pyro-oil, carbon black, steel wire. CPCB SOP-compliant.
- Continuous / semi-continuous reactor
- Multi-stage condenser train
- Wet scrubber + bag filter
- HOWM Rules 2016 compliance
4 phases Β· single-point accountability
Phase 01 β Survey & DPR
Waste audit, site assessment, tonnage projection, detailed project report, regulatory mapping.
Phase 02 β Design & civil
Layout, civil foundation, drainage, leachate management, electrical & plumbing design.
Phase 03 β Supply & install
OWC machines, shredders, balers, accessories, PLC panels, on-site erection & piping.
Phase 04 β Commissioning & O&M
Trial runs, operator training, handover docs, optional long-term AMC.
What we handle in-house vs partner
| Scope item | In-house | Partner |
|---|---|---|
| Site survey & waste audit | β KWTPL engineering | β |
| DPR + BOQ + rate justification | β KWTPL engineering | β |
| Equipment design & manufacture | β Manesar plant | β |
| PLC, electrical, automation | β Havells / Schneider / L&T | β |
| Civil β foundation, shed, drainage | ~ Supervised | Local civil partner |
| Statutory clearances (CTE / CTO / NOC) | ~ Documentation support | Local PCB liaison |
| Installation & erection | β KWTPL field team | β |
| Commissioning & trial runs | β KWTPL engineers | β |
| Operator training | β Bilingual (Hindi/English) | β |
| O&M / AMC | β AMC packages available | β |
Have a tender or RFP draft?
Send it to info@kelvinindia.in. Free DPR review by our engineering team β even if you don't bid through us.
Three questions to find your fit
Quick decision matrix β the right K-program depends on the buyer profile, capacity, and waste stream.
| If you are⦠| Capacity range | Recommended program | Indicative CapEx |
|---|---|---|---|
| ULB Β· Nagar Nigam Β· Smart City ward | 5 β 50 TPD | K-Civic Β· MSWM turnkey | ~βΉ1.2 β 14 Cr |
| Hotel Β· hospital Β· IT campus Β· FMCG plant Β· gated community | 100 kg/d β 5 TPD | K-Campus Β· institutional composting | ~βΉ4 β 160 L |
| Brand owner Β· MRF operator Β· waste processor | 5 β 100 TPD dry-waste | K-Recover Β· MRF | Sized to scope |
| EPR aggregator Β· industrial Β· plastic / tyre processor | 2 β 20 TPD | K-Pyro Β· pyrolysis | ~βΉ1.8 β 16 Cr |
Not sure? Use the configurator β answer 4 quick questions, get a tailored brief in 2 minutes.
Have a tender, RFP or DPR draft?
Send your RFP / DPR / scope-of-work document β we'll respond with a tailored technical brief, indicative BOQ, scheme alignment notes and CapEx range within 1 working day. Pre-bid clarifications in under 48 hours.